Just attempted SSC CGL 2021 Tier-I (HO 21/04/2022 S-3) Test Scored::47.5/ 200 Test listTake Test
Ytube Answers
A, B and C can individually complete a task in 24 days, 20 days and 18 days, respectively. B and C start the task, and they work for 6 days and leave. The number of days required by A alone to finish the remaining task is:
A can do 40% of a work in 12 days, whereas B can do 60% of the same work in 15 days. Both work together for 10 days. C completes the remaining work alone in 4 days. A, B and C together will complete 28% of the same work in :
Two poles of equal height are standing opposite to each other on either side of a road which is 100 m wide. From a point between them on road, angles of elevation of their tops are 30° and 60°. The height of each pole in meter, is: